Latest News
The first Consortium/Steering Committee Meeting held on 30th September 2005 at Tarmac Precast Concrete Ltd, Tallington, UK, at 9.00 am
Present at the meeting were:
- Professor Pal Mangat, Sheffield Hallam University, Chair
- Colin Richard, Tarmac Precast Concrete Ltd
- Bert van Soest, ERBA,
- David Catley, Inditherm
- Iordanis Chidiroglou, Sheffield Hallam University
- Richard Harpum, Inditherm
- Janusz Wojciechowski, WPS sa
- Jan Deja, Academia Gorniczo-Hutnieza
- Otakar Vystrčil, RIBM Brno
- Jose Ma Uribarri, Angio S.A.
- Jose Tomás San José, Fundacion LABEIN
- Javier Campos León, Bikani S.L.
It was decided to proceed with the work schedule as it has been stated in the LOVACS document. For further information contact us.
image description
The second Consortium/Steering Committee Meeting was held on 17th February 2006 at LABEIN-Tecnalia Technology Centre, Bilbao, Spain, at 9.00 am
Present at the meeting were:
- Professor Pal Mangat,Sheffield Hallam University, Chair
- José Tomás San José, LABEIN Tecnalia
- Ricardo Barkala, LABEIN Tecnalia
- Isaac Garrucho, LABEIN Tecnalia
- Bert van Soest, ERBA,
- David Catley, Inditherm
- Jose Ma Uribarri, Angio S.A.
- Richard Harpum, Inditherm
- Janusz Wojciechowski, WPS sa
- Jan Deja, Academia Gorniczo-Hutnieza
- Javier Campos León, Bikani S.L.
- Iordanis Chidiroglou , Sheffield Hallam University
- Zbigniew Kozakiewicz, Prefabet Kolbuszova SA
The meeting concluded that all work stated in the Workpackages of the project is proceeding according to the timetable of the LOVACS document. For further information contact us.
image description
The third Consortium/Steering Committee Meeting was held at 9.00 am on 10th May 2006 at Tulip Inn Hotel, Amsterdam, Holland
Present at the meeting were:
- Professor Pal Mangat, Sheffield Hallam University, Chair
- José Tomás San José, LABEIN Tecnalia
- Bert van Soest, ERBA
- Ruud Kerkhof, ERBA
- Colin Richards, Tarmac Precast Concrete Ltd
- David Catley, Inditherm
- Jose Marie Uribarri, Angio S.A.
- Richard Harpum, Inditherm
- Janusz Wojciechowski, WPS sa
- Jan Deja (JD), Academia Gorniczo-Hutnieza
- Jose Javier Gonzalez Arregui, Bikani S.L.
- Iordanis Chidiroglou , Sheffield Hallam University
All participants presented the work they have done over the past six months of the project and it was shown that all Tasks stated in the LOVACS document are progressing in accordance with the required timetable. For further information contact us.
image description